Boubyan Seaport Project Phase 1 - Stage 1 Road, Bridge and Soil Treatment Works

Boubyan Seaport Project Phase 1 - Stage 1 Road, Bridge and Soil Treatment Works, is a EPC project, including 30.30km 2-way 6-lane road and foundation for 24.305km multitrack railways, which include a 1.42km road bridge and a 4.245km railway bridge across Subiya Straits, and the sub-works for soil foundation treatment below roadbed.

The project is contracted to the joint venture of CHEC and two local companies (GDC and SAC). CHEC is responsible for the road bridge, railway bridge and the sub-works for soil foundation treatment below roadbed.

Photo Gallery

Project Details

Location

Kuwait

Employer

Ministry of Public Works(MPW)

Contract Value

Duration

Sep. 1st , 2007-Feb. 28th , 2011

Business Type

Road & Bridge